University of Leeds
Montague Burton residences
Student Accommodation
We completed the mechanical and plumbing refurbishment for phase one of the Montague Burton Residences 3 year refurbishment programme during summer 2016.
The phase one refurbishment focused on three blocks of the student accommodation, a total of 104 bedrooms.
Works undertaken included:
- Installation of new LST radiators, boilers, alterations to interal gas pipework and installation of new gas riser.
- Installation of new unvented hot water cylinders to new plantrooms as well as specified pumps and valves.
- Installation of new sanitary ware throughout student flats.
- Chlorination & water hygiene management flushing regime as per University of Leeds guidelines and Legionella Risk Assessment.
These works were undertaken during the summer break for students, within a fixed programme. It was essential that we completed works in line with the programme and in conjunction with other contractors so the accommodation was ready for the new student term at the beginning of September.
Henry Price accommodation
Student Accommodation
VWG Mechanical have undertaken refurbishment of the student accommodation within the grade II listed Henry Price Building over a phased programme of works.
Works undertaken included:
- Strip out and replacement of sanitary ware
- Modifications to hot and cold water services
- Modifications to existing extract ventilation to accommodation new installations
- Chlorination & water hygiene management flushing regime as per University of Leeds guidelines and Legionella Risk Assessment.
These works were also undertaken within a fixed programme over the summer holidays. VWG Mechancial completed all works within this, enabling hand over of the building in time for students returning to the Autumn term.
Garstang laboratory
Laboratory refurbishment
Works were undertaken in the Garstang laboratory to modify and install new heating, cooling, hot and cold water services and controls during a period of time when the building was occupied. VWG Mechanical worked in partnership with the main contractor and University to schedule and undertake works with minimal impact to the building users, while achieving KPI’s.
Works undertaken included:
- Modifications to existing heating system including new pipework and radiators
- Installation of new cooling system with external condensers connected to internal BC box
- Modifications to existing ventilation and installation of new ductwork
- Install new basins, hot water heaters and modifications to existing water services