Lancaster University
VWG Mechanical have undertaken a number of projects to replace and refurbish mechanical plant at the Centre for Ecology & Hydrology at Lancaster University.
These works have included;
- Replacement and installation of new Broag Quinta Pro 65 boilers, new flues and modification to existing controls.
- Replacement of cold water booster sets including new isolating valves and drain off facilities.
- Removal of 2 existing calorifiers and replacement with a single capacity calorifier to comply with L8 regulations. Chlorination of new installation also carried out in line with Lancaster University guidelines.
- Removal of existing cold water storage tank and replacement with a small sized tank to comply with L8 regulations. Sterilisation of new tank carried out on completion of works in line with Lancaster University guidelines.
- Removal of TMV3 blending valves throughout the building, installation of new dedicated quarter turn isolation valves and pipework modifications.