Crown House Properties – Clarence Terrace London

VWG were appointed principal contractor to replace an oil fired boiler plant and domestic hot water storage cylinders with a new gas fired boiler plant, flue system & automatic controls. 3 No. Remeha 310 Eco Pro 10 high efficiency condensing boilers were installed along with new pressurisation unit and expansion vessel. The DHWS cylinders were replaced with 3 new 500 litre cylinders complete with integrated plate heat exchange and circulation pumps to provide high efficient hot water service generation to meet demand with sufficient resilience in the event of a failure.

The residences at Clarence House were occupied throughout the works. Therefore VWG utilised a temporary boiler plant to provide domestic hot and cold water throughout the project, minimising disruption to residents.

As principal contractor VWG co-ordinated all CDM requirements on the project, working closely with contract administrator, principal designer and external H&S co-ordinators, ensuring works were completed within a safe environment for all operatives, residents and visitors to the residences.

More Projects

Blackburn Technology Management Centre

De-carbonisation

Coventry Central Library

De-carbonisation

Advanced Manufacturing Park

De-carbonisation

University of Bradford

Lab refurbishment

University of Leicester

Water Segregation

Kettlethorpe High School

Heating Replacement

Broomhill Infants School

New VRF system

Leeds Arts University

Heating Replacement

Kettering Hospital

Off site fabrication